Eagle Lake Membrane Filtration Facility

The project includes the construction of a new round cast in place concrete clearwell and a new water treatment plant. Because of the location of the work, the project presented some logistical as well as environmental challenges. Good planning and cooperation with the general contractor has minimized these challenges. The round clearwell was formed using PERI Formwork’s Rundflex forming system. We used a "Self erecting tower crane" supplied by Eagle West Truck and Crane to look after the material handling issues for the project.

Location:
West Vancouver, B.C.

Owner:
District of West Vancouver

General Contractor:
Nason Contracting Group Ltd

Consultant:
Dayton & Knight Ltd

Dates:
February 2007 – September 2007

Volume of Concrete Placed:
2000 m³

  • Image 005eaglelake01
  • Image 005eaglelake02
  • Image 005eaglelake03
  • Image 005eaglelake04
  • Image 005eaglelake05
  • Image 005eaglelake06
  • Image 005eaglelake07
  • Image 005eaglelake08
  • Image 005eaglelake09
  • Image 005eaglelake10
  • Image 005eaglelake11
  • Image 005eaglelake12
  • Image 005eaglelake13
  • Image 005eaglelake14