WTP Residuals Equalization and Dechlorination Facility
This project consists of the addition of two 7m deep tanks onto the existing WTP and conduits on two sides of the structure. The excavation was completely flooded in June of 2013.
Location:
Medicine Hat, AB
Owner:
City of Medicine Hat
General Contractor:
Tritech Group Ltd
Consultant:
Associated Engineering Ltd
Dates:
June 2013 – March 2014
Volume of Concrete Placed:
1600 m³
|