WTP Residuals Equalization and Dechlorination Facility

This project consists of the addition of two 7m deep tanks onto the existing WTP and conduits on two sides of the structure. The excavation was completely flooded in June of 2013.

Location:
Medicine Hat, AB

Owner:
City of Medicine Hat

General Contractor:
Tritech Group Ltd

Consultant:
Associated Engineering Ltd

Dates:
June 2013 – March 2014

Volume of Concrete Placed:
1600 m³