New River Pumphouse

This project consists of a 14m deep raw water pump station with a pump house above. The construction site was adjacent to the South Saskatchewan River.

Location:
Suffield, AB

Owner:
Department of National Defence

General Contractor:
MJB Enterprises Ltd

Consultant:
AMEC

Dates:
March 2013 – August 2013

Volume of Concrete Placed:
400 m³

  • Image 039newriver01
  • Image 039newriver02
  • Image 039newriver03
  • Image 039newriver04
  • Image 039newriver05
  • Image 039newriver06
  • Image 039newriver07