Thickwood Reservoir Replacement

Replacement of an existing reservoir on a congested site in an already developed area of Thickwood Heights. The new reservoir is 35 m long and 21 m wide and 7.3 m deep.

Location:
Fort McMurray, AB

Owner:
Regional Municipality of Wood Buffalo

General Contractor:
Nason Contracting Group Ltd

Consultant:
Aecom

Dates:
August 2012 – April 2013

Volume of Concrete Placed:
1377 m³