Village of Hines Creek WTP Upgrades
This project consisted of an addition to an existing WTP to house a Membrane Treatment system. Construction was a masonry building with wood truss roof and metal cladding.
Location:
Hines Creek, AB
Owner:
Village of Hines Creek
General Contractor:
QQR Mechanical Ltd
Consultant:
Associated Engineering Ltd
Dates:
March 2012 – September 2012
Volume of Concrete Placed:
140 m³
|