The project includes the construction of a new cast in place concrete reservoir adjacent to an existing reservoir near the Grande Prairie airport.

Location:
Grande Prairie, Alberta

Owner:
Aquatera Utilities Inc

General Contractor:
Nortech Systems Ltd

Consultant:
GPEC Consulting Ltd

Dates:
August 2006 – December 2006

Volume of Concrete Placed:
1100 m³