Town of Mayerthorpe Water Treatment Plant Upgrade

A below ground cast in place reservoir with an adjacent waste chamber. The project also included the construction of a metal clad wood framed WTP building above the reservoir complete with a lab and chlorine room within.

Location:
Mayerthorpe, AB

Owner:
Town of Mayerthorpe

General Contractor:
QQR Mechanical Contracting Ltd.

Consultant:
DCL Siemens Engineering Ltd.

Dates:
June 2010 – February 2011

Volume of Concrete Placed:
590 m³