Town of Mayerthorpe Water Treatment Plant Upgrade
A below ground cast in place reservoir with an adjacent waste chamber. The project also included the construction of a metal clad wood framed WTP building above the reservoir complete with a lab and chlorine room within.
Location:
Mayerthorpe, AB
Owner:
Town of Mayerthorpe
General Contractor:
QQR Mechanical Contracting Ltd.
Consultant:
DCL Siemens Engineering Ltd.
Dates:
June 2010 – February 2011
Volume of Concrete Placed:
590 m³
|