Town of Gibbons Sanitary Lift Station & Forcemain
A 12 m deep cast in place concrete lift station. The wet well was formed using a one sided forming system with the walls cast against a Multi-plate excavation shoring.
Location:
Gibbons, AB
Owner:
Town of Gibbons
General Contractor:
Inline Contracting Ltd.
Consultant:
Select Engineering Consultants Ltd.
Dates:
May 2010 – August 2010
Volume of Concrete Placed:
130 m³
|