Town of Gibbons Sanitary Lift Station & Forcemain

A 12 m deep cast in place concrete lift station. The wet well was formed using a one sided forming system with the walls cast against a Multi-plate excavation shoring.

Location:
Gibbons, AB

Owner:
Town of Gibbons

General Contractor:
Inline Contracting Ltd.

Consultant:
Select Engineering Consultants Ltd.

Dates:
May 2010 – August 2010

Volume of Concrete Placed:
130 m³