The project includes the construction of a new two cell cast in place concrete reservoir. It also included a dry well valve chamber and a pump house. This was our second project for Nortech and Aquatera Utilities. In addition to our normal scope of work, we also included the supply and installation of reinforcing steel in our contract.

Location:
Grande Prairie, Alberta

Owner:
Aquatera Utlities Inc

General Contractor:
Nortec Systems Ltd.

Consultant:
ISL Engineering

Dates:
April 2009 – August 2009

Volume of Concrete Placed:
1650 m³