East Nisku Reservoir and Pumphouse

The project includes the construction of a new cast in place concrete reservoir and a pump house in the Nisku Industrial Park. The walls were formed using the Symons Alispy steel forming system. The suspended slabs were formed using the GASS forming system supplied by Patent Construction systems. The GASS system was assembled as "rolling tables" and reused for seven pours. The material handling requirements were met using a "self-erecting tower crane" supplied by Eagle West truck and Crane.

Location:
Nisku, Alberta

Owner:
County of Leduc

General Contractor:
Nason Contracting Group Ltd

Consultant:
UMA Engineering Ltd

Dates:
April 2006 – August 2006

Volume of Concrete Placed:
2500 m³